Bee Your GC List your services free →
CK

Carl Kennedy

DemolitionAppliance installGuttersPaintingRoofing

Carl’s Test Company

Washington, DC

Verified Projects

5

Trades

Verified Hours on Platform0h
0100h milestone

Know someone who needs Carl?

Share this pro with a friend. Sign in first to earn rewards when your referral hires.

Contact Carl’s Test Company

Projects

Bathroom Renovation, Interior Paint & Accessibility Upgrades

Demolition

Bathroom Renovation, Interior Paint & Accessibility Upgrades

Full bathroom demolition and fixture replacement, interior paint refresh for 2 bedrooms plus kitchen, single-flight chairlift installation, front porch structural rebuild, and new 20 ft × 10 ft driveway paving. No known electrical or plumbing upgrades required. Assumptions: • Bathroom renovation includes demolition and replacement of toilet, sink, and shower/tub; assumes ~40–50 sq ft bathroom with standard finishes (tile, paint, basic fixtures). • Paint scope covers 2 bedrooms and kitchen only; assumes ~100–120 sq ft per bedroom and ~150 sq ft kitchen, 8 ft ceilings, prep includes patching and priming. • Single-flight chairlift installation on existing staircase; assumes standard residential stairway (12–14 steps). • Front porch rebuild from framing; assumes ~12 ft × 8 ft deck footprint with new decking, railings, and finish paint. • Driveway paving is new 20 ft long × 10 ft wide (200 sq ft) asphalt surface; assumes 3–4 inch depth and site prep removal. • No structural, plumbing, or electrical concerns flagged; assumes straightforward execution. Scope: • demolition: Bathroom fixture and tile demolition (toilet, sink, shower/tub surround); drywall/surface prep removal as needed. • plumbing: Install new toilet, sink, and shower/tub with rough-in connections; no structural upgrades flagged. • tile: Bathroom tile work: shower surround and floor; assumes ~150 sq ft tile installation and grout. • painting: Full prep and paint: 2 bedrooms (~220 sq ft), kitchen (~150 sq ft), bathroom (~50 sq ft), ~8 ft ceilings; includes patching, priming, two coats. • carpentry: Front porch rebuild from framing: decking (~100 sq ft), railings, structural connections; finish paint included under painting trade. • general: Chairlift installation on single flight (12–14 steps); includes unit, rail, structural anchors, and operational testing. • paving: New asphalt driveway: 20 ft × 10 ft (200 sq ft), 3–4 inch depth; includes site prep, base, and finish.

1mActive

Powered by Bee Your GC